- BART Berryessa Extension — Twin-Bore Tunneling Approach 93%
Twin-bore TBM tunneling delivered the BART Berryessa Extension subway-grade alignment on a $2.3B program, navigating PG&E transmission and SJ Water utility conflicts under live-rail constraints.
- Caltrain Peninsula Electrification — Schedule Control Narrative 88%
AGS served as Program Management Consultant on the $2.4B Caltrain Electrification across a 51-mile corridor, managing 14 prime contractors and FTA CIG compliance. Final cost within 1.2% of approved…
- Muni Metro Embarcadero Subway Station — Renovation 85%
Muni Metro Embarcadero subway station renovation delivered $185M of platform, mezzanine, and vertical-circulation upgrades within an active station, completed three weeks ahead of schedule.
- VTA Eastridge to BART Silicon Valley Phase II — DBE Plan 79%
Phase II proposal addresses 6-mile light rail extension with three new stations and a maintenance facility, including a 25% DBE participation plan modeled on Caltrain Electrification governance.
- LA Metro Purple Line Subway Extension Section 3 — Tunneling Risk 81%
Purple Line subway extension Section 3 navigated tar-sand and methane gas zones via slurry-pressure-balance TBMs; quarterly Monte Carlo schedule risk analysis kept the program within FTA CIG fundin…
- WMATA Silver Line Phase 2 — FTA Compliance Findings 69%
Phase 2 of the Silver Line encountered FTA CIG compliance findings on quarterly reporting cadence and EVM baseline integrity, requiring a 6-month corrective action plan that delayed revenue service.
- Sound Transit East Link Extension — I-90 Floating Bridge Crossing 65%
East Link Extension crossed Lake Washington on the world-first floating-bridge light-rail alignment, requiring expansion-joint and vibration-isolation peer review with 40% reduction in structure-bo…
- SFMTA Central Subway Phase 1 — Program Management Plan 94%
Central Subway Phase 1 PM Plan established the FTA CIG reporting cadence, SOMA utility coordination protocol with PG&E and SFPUC, and the 25% LBE participation framework that the Extension proposal…
- Honolulu HART Skyline — Elevated Guideway Sequencing 62%
HART Skyline elevated-guideway proposal sequenced 20-mile alignment in three operational segments to begin partial revenue service while later phases were under construction, mitigating cost-overru…